Our offices will be closed Monday November 11th, in observance of Veteran’s Day. If you have any urgent issues, you can still call into your district for assistance.

Rates & Tariffs

Del Oro Water Company is firmly committed to producing and delivering a safe, dependable supply of quality water in an efficient, cost effective manner with service that exceeds the expectations of our customers.  Water rates and tariffs for regulated water systems are established by the California Public Utilities Commision (CPUC).  The rates and tariffs presented are the most current adopted by the CPUC.

Rates and Tariffs

District Search

Arbuckle District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 210.00
Meter Size Monthly Charge
5/8 by 3/4 inch $  30.65
3/4 inch $  45.98
1 inch (All homes have these) $  60.00
1 1/2 inch $ 153.27
2 inch $ 245.23
3 inch $ 459.81
Quantity Rate
For all water used, per 100 cubic feet $ 2.776
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Benbow District

General Metered Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Facilities Fee
Applicable to all customers applying for service in the utility in Pressure Zones 2 and 3 in the territory served for premises not previously connected to its distribution mains, for additional service connections to existing premises, and for increases in size of service connections to existing premises. See Schedule BN-F.
Meter Size Initial Fee per Connection
5/8 by 3/4 inch $  6,000.00
3/4 inch $  9,000.00
1 inch $ 15,000.00
1 1/2 inch $ 31,000.00
2 inch $ 48,000.00
New Service Advance Deposit Zone 1 Zones 2 & 3
Applies to all new accounts $ 223.12 $ 284.44
Meter Size Monthly Charge
Zone 1 Zones 2 & 3
5/8 by 3/4 inch $      55.78 $    142.22
3/4 inch $      83.67 $    213.32
1 inch $    139.45 $    355.54
1 1/2 inch $    278.89 $    711.08
2 inch $    446.23 $ 1,137.72
3 inch $    836.68 $ 2,133.23
4 inch $ 1,394.46 $ 3,555.38
Quantity Rate Zone 1 Zones 2 & 3
For all water used, per 100 cubic feet $ 3.043 $ 5.820
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

 

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 9, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Advice Letter 509

Updated on 01 March 2019

Service Area Map Update
Effective: February 8, 2019
DOWNLOAD

Advice Letter 489

Updated on 20 June 2017

Acquisition of Benbow District
Effective: June 14, 2017
DOWNLOAD

Black Butte District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 213.54
Meter Size Monthly Charge
5/8 by 3/4 inch $  35.59
3/4 inch $  53.39
1 inch $  88.98
1 1/2 inch $ 177.96
2 inch $ 284.74
Quantity Rate
For all water used, per 100 cubic feet $ 1.750
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7 surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Buzztail District

General Metered Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Connection Fee $ 10,000.00
Applies ONLY to properties that have not previously been connected to the water system
New Service Advance Deposit $ 218.82
Applies to all new accounts
Meter Size Monthly Charge
5/8 by 3/4 inch $ 72.94
3/4 inch $ 72.94
1 inch $ 72.94
1 1/2 inch $ 72.94
2 inch $ 72.94
3 inch $ 72.94
4 inch $ 72.94
Quantity Rate
For all water used up to 30,000 gallons, per 1,000 gallons $ 2.738
For all water used over 30,000 gallons and up to 100,000 gallons, per 1,000 gallons $ 4.107
For all water used over 100,000 gallons, per 1,000 gallons $ 6.844
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Buzztail Irrigation

Irrigation Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Connection Fee $ 10,000.00
Applies ONLY to properties that have not previously been connected to the water system
New Service Advance Deposit $ 218.82
Applies to all new accounts
Meter Size Monthly Charge
5/8 by 3/4 inch $ 72.94
3/4 inch $ 72.94
1 inch $ 72.94
1 1/2 inch $ 72.94
2 inch $ 72.94
3 inch $ 72.94
4 inch $ 72.94
Quantity Rate
For all water used up to 30,000 gallons, per 1,000 gallons $ 2.738
For all water used over 30,000 gallons, per 1,000 gallons $ 4.363
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Advice Letter 508

Updated on 25 January 2019

Lost Revenue Memorandum Account – CAMP Fire
Effective: November 9, 2018
DOWNLOAD

California Pines District

ALL (PINE FLAT and PINE MOUNTAIN) Service Areas

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 189.42
Meter Size Monthly Charge
5/8 by 3/4 inch (most homes have these) $    63.14
3/4 inch $    94.71
1 inch $   157.86
1 1/2 inch $   315.72
2 inch $   505.14
3 inch $   947.15
4 inch $ 1,578.58
6 inch $ 3,157.15
Quantity Rate
For all water used, per 100 cubic feet $ 12.681
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Country Estates District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 204.75
Meter Size Monthly Charge
5/8 by 3/4 inch $  29.25
3/4 inch $  43.87
1 inch (most homes have these) $  73.11
1 1/2 inch $ 146.23
2 inch $ 233.96
3 inch $ 438.68
Quantity Rate
For all water used, per 100 cubic feet $ 2.439
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Ferndale District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 220.50
Meter Size Monthly Charge
5/8 by 3/4 inch (most homes have these) $  44.10
3/4 inch $  66.16
1 inch $ 110.26
1 1/2 inch $ 220.52
2 inch $ 352.83
4 inch $ 661.56
6 inch $ 2,205.21
8 inch $ 3,528.34
Quantity Rate
For all water used, per 100 cubic feet $ 5.800
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Hat Creek District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 217.56
Meter Size Monthly Charge
5/8 by 3/4 inch $   31.08
3/4 inch $   46.62
1 inch $   77.70
1 1/2 inch $ 155.40
2 inch $ 248.63
3 inch $ 466.19
Quantity Rate
For all water used, per 100 cubic feet $ 4.500
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Advice Letter 510

Updated on 11 September 2019

Acquisition of Hat Creek District
Effective: August 14, 2019
DOWNLOAD

Johnson Park District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Facility Fee $ 9,173.00
Applies ONLY to properties that have not previously been connected to the water system. See Schedule JP-F
New Service Advance Deposit $ 198.20
Meter Size Monthly Charge
5/8 by 3/4 inch (most homes have these) $   49.55
3/4 inch $   74.33
1 inch (all Rocky Ledge Estates) $ 123.88
1 1/2 inch $ 247.76
2 inch $ 396.41
Quantity Rate
For all water used, per 100 cubic feet $ 5.179
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Schedule JP-F

Updated on 21 May 2013

Facilities Fee – New Connections
Effective: Resolution W-4710
DOWNLOAD

Larkspur Meadows District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 189.44
Applies to all new accounts
Meter Size Monthly Charge
5/8 by 3/4 inch (most homes have these) $     47.36
3/4 inch $     71.04
1 inch $   118.40
1 1/2 inch $   236.80
2 inch $   378.88
3 inch $   710.40
4 inch $ 1,184.00
6 inch $ 2,367.99
Quantity Rate
For all water used, per 100 cubic feet $ 2.250
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Lime Saddle District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Facility Fee Varies
Applies ONLY to properties that have not previously been connected to the water system OR to properties needing extensions or size changes to existing lines. See Schedule LS-F
New Service Advance Deposit $ 191.45
Meter Size Monthly Service Charge SRF Surcharge
5/8 by 3/4 inch $    27.35 $ 16.03
3/4 inch $    41.02 $ 24.03
1 inch $    68.37 $ 40.06
1 1/2 inch $  136.74 $ 80.12
2 inch $  218.78 $ 128.19
3 inch $  410.22 $ 240.37
4 inch $  683.70 $ 400.61
6 inch $1,367.40 $ 801.22
Quantity Rate
For all water used, per 1000 gallons $ 4.281
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

State Revolving Fund (SRF) Surcharge
The monthly surcharge is specifically for the repayment of the State Revolving Fund for the Regional Intertie Project as authorized by Decision 08-05-032 as adjusted by Decision No. D. 14-02-034, dated February 27, 2014 as further amended on March 21, 2014. The monthly Surcharge Rates are subject to adjustment. All Lime Saddle customers who already paid the $5,000.00 Connection Fee are excluded from the SRF Surcharge; however, all active Lime Saddle connections are responsible for a proportionate share of the Phase I equity costs to be put into rates as of the conclusion of the project.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Advice Letter 508

Updated on 25 January 2019

Lost Revenue Memorandum Account – CAMP Fire
Effective: November 9, 2018
DOWNLOAD

Advice Letter 342-A

Updated on 21 May 2013

New Premises Facility Fee
Effective: September 6, 2012
DOWNLOAD

Advice Letter 202

Updated on 09 October 2008

Charge for Commitment to Future Services
Effective: October 3, 2008
DOWNLOAD

Schedule LS-F

Updated on 15 May 2017

Facilities Fees – New Connections
Effective: September 6, 2012
DOWNLOAD

Magalia District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 201.74
Meter Size Monthly Service Charge SRF Surcharge
5/8 by 3/4 inch (most homes have these) $  44.83 $  5.16
3/4 inch $  67.24 $  7.74
1 inch $ 112.07 $ 12.89
2 inch $ 358.64 $ 41.26
Quantity Rate
For all water used, per 1,000 gallons $ 7.537
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

State Revolving Fund (SRF) Surcharge
The monthly Surcharge is specifically for repayment of the State Revolving Fund for the Regional Intertie Project as authorized by Decision 08-05-032, as adjusted by Decision no. D. 14-02-034, dated February 27, 2014 as further amended on March 21, 2014. The monthly Surcharge Rates are subject to adjustment.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Advice Letter 508

Updated on 25 January 2019

Lost Revenue Memorandum Account – CAMP Fire
Effective: November 9, 2018
DOWNLOAD

Advice Letter 502

Updated on 13 August 2018

Lost Revenue Memorandum Account – CAMP Fire
Effective: August 14, 2018
DOWNLOAD

Metropolitan District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 220.75
Meter Size Monthly Charge
5/8 by 3/4 inch $  44.15
3/4 inch $  66.23
1 inch $ 110.38
1 1/2 inch $ 220.76
2 inch $ 353.21
Quantity Rate
For all water used, per 100 cubic feet $ 2.707
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Mt. Lassen District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 220.00
Meter Size Monthly Charge
5/8 by 3/4 inch $  26.36
3/4 inch $  39.54
1 inch $  55.00
1 1/2 inch $ 131.80
2 inch $ 210.87
Flat Rate
For a single-family residential unit and/or an individual lot: $  60.02
Quantity Rate
For all water used, per 100 cubic feet $ 2.510
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Schedule ML-MHF

Updated on 20 May 2013

Meter Hook-Up Fee
Effective: Advice Letter 194-A
DOWNLOAD

Paradise Pines District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 210.60
Meter Size Monthly Service Charge SRF Surcharge
(AL 372)
5/8 by 3/4 inch (most homes have these) $    35.10 $ 4.33
3/4 inch $    53.10 $ 6.49
1 inch $    88.00 $ 10.81
1 1/2 inch $  177.00 $ 21.63
2 inch $  284.00 $ 34.60
3 inch $  533.00 $ 64.88
4 inch $  888.00 $ 108.14
6 inch $1,777.00 $ 216.28
Quantity Rate
For all water used, per 100 cubic feet $ 5.200
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

State Revolving Fund (SRF) Surcharge
The monthly Surcharge is specifically for repayment of the State Revolving Fund for the Regional Intertie Project as authorized by Decision 08-05-032, as adjusted by Decision no. D. 14-02-034, dated February 27, 2014 as further amended March 21, 2014. The monthly Surcharge Rates are subject to adjustment.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Advice Letter 508

Updated on 25 January 2019

Lost Revenue Memorandum Account – CAMP Fire
Effective: November 9, 2018
DOWNLOAD

River Island District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 225.00
Meter Size Monthly Service Charge SRF Surcharge
Territory 1 Customers Only
(AL 525-A)
Up to 1 inch $   75.00 $ 78.18
1 1/2 inch $ 154.59 $ 156.37
2 inch $ 247.35 $ 250.19
3 inch $ 463.77 $ 469.11
4 inch $ 772.96 $ 781.85
6 inch $1,545.91 $ 1,563.69
Quantity Rate
For all water used, up to 10,000 cf, per 100 cubic feet $ 3.200
For all water used, over 10,000 cf, per 100 cubic feet $ 4.300
Late Fee
For monthly bills not paid by the due date $ 10.00

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Drinking Water State Revolving Fund Undeveloped Lot Charge
Applicable to all undeveloped lots within the service territory of River Island District 1. A service fee to provide for reduction of the Drinking Water State Revolving Fund Loan Surcharge is chargeable to customers requesting future service to undeveloped lots. The Service fees was authorized by Resolution No. W-5245.

The service fee shall be the accumulated total of the surcharges provided for in Schedule No. RI-1, as applied to the property being furnished water service from the effective date of the advice letter to the date of connection. The maximum service charge shall be $2,000. The service fee shall be due and payable upon connection of water service to the lot. The surcharge authorized by the Commission, as contained in Schedule No. RI-1 will apply thereafter.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Private Fire Protection Service
For each 4″ fire hydrant with one 2.5″ outlet $ 2.50
For each 6″ riser hydrant with steamer $ 3.00

River Island Irrigation

IRRIGATION Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit None
Meter Size Monthly Charge
All None
Quantity Rate
For all water used, up to 2,500 cf, per 100 cubic feet $ 2.700
For all water used, over 2,500 cf, per 100 cubic feet $ 4.300
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 543

Updated on 25 October 2023

Activating Schedule 14.1 Stage 5
Effective: October 25, 2023
DOWNLOAD

Advice Letter 542

Updated on 17 August 2023

Activating Schedule 14.1 Stage 4
Effective: August 17, 2023
DOWNLOAD

Advice Letter 541

Updated on 06 July 2023

Activating Schedule 14.1 Stage 2
Effective: July 6, 2023
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 525-A

Updated on 22 November 2021

Authority to Increase SRF Borrowing
Effective: November 18, 2021
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Advice Letter 493

Updated on 25 June 2018

Request Authority for SRF Loan & Surcharge
Effective: June 21, 2018
DOWNLOAD

Advice Letter 492

Updated on 11 November 2019

Request to Establish Point of Use Memorandum Account
Effective: March 1, 2017
DOWNLOAD

Advice Letter 300

Updated on 21 May 2013

Surface Water Treatment Plant Project
Effective: Pending
DOWNLOAD

Stirling Bluffs District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 198.38
Meter Size Monthly Charge
5/8 by 3/4 inch (most homes have these) $ 28.34
3/4 inch $ 33.51
1 inch $ 43.85
1 1/2 inch $ 69.71
2 inch $ 100.74
3 inch $ 173.14
4 inch $ 276.56
Quantity Rate
For all water used, per 100 cubic feet $ 4.400
Low-Income Rate Assistance (LIRA)
Surcredit
Eligible (participating) customers only
20% of base service charge for 5/8″x3/4″

Maximum credit is $5.87 per month

Surcharge
Ineligible (non-participating) customers only
$5.78
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 545

Updated on 17 July 2024

LIRA Annual Update
Effective: July 17, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Strawberry District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 265.72
New Service Facility Fee Varies
ONLY applies to properties that have not previously been connected to the water system. See Schedule ST-F
Meter Size Monthly Service Charge
5/8 by 3/4 inch (most homes have these) $ 132.86
3/4 inch $   199.30
1 inch $   332.16
1 1/2 inch $   664.31
2 inch $ 1,062.91
3 inch $ 1,992.95
4 inch $ 3,321.57
6 inch $ 6,643.15
Quantity Rate
For all water used, per 100 cubic feet $ 11.503
Low-Income Rate Assistance (LIRA)
Surcredit
Eligible (participating) customers only
50% of base service charge for 5/8″x3/4″
Maximum of $59.81
Surcharge
Ineligible (non-participating) customers only
$1.09
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 545

Updated on 17 July 2024

LIRA Program Annual Update
Effective: July 17, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Schedule ST-F

Updated on 21 May 2013

Schedule ST-F
Effective: Resolution W-4648
DOWNLOAD

Traver District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 230.08
Meter Size Monthly Charge
3/4 inch $     57.52
1 inch $     95.86
1 1/2 inch $   191.72
2 inch $   306.75
3 inch $   575.15
4 inch $   958.59
6 inch $ 1,917.17
Quantity Rate
For all water used, per 100 cubic feet $ 1.745
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Tulare District

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ 204.36
Meter Size Monthly Charge
5/8 x 3/4 inch $   51.09
3/4 inch $   76.63
1 inch $  127.72
1 1/2 inch $  255.44
2 inch $  408.71
3 inch $  766.33
4 inch $  1277.21
Quantity Rate
For all water used, per 100 cubic feet $ 2.392
Late Fee
For monthly bills not paid by the due date $ 10.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 546

Updated on 15 August 2024

Uncollected Revenue from 2023 GRC &
Camp Fire Refund Credit to Customers

Effective: September 11, 2024
DOWNLOAD

Advice Letter 538

Updated on 09 March 2023

Interim Rate CPI
Effective: March 9, 2023
DOWNLOAD

Advice Letter 537-A

Updated on 11 July 2024

Statewide General Rate Case
Effective: March 09, 2023
DOWNLOAD

Advice Letter 532

Updated on 26 April 2022

Rule & Schedule 14.1 Update
Effective: May 26, 2022
DOWNLOAD

Advice Letter 523

Updated on 24 November 2020

Interim Rate Surcharge Statewide GRC
Effective: September 17, 2020
DOWNLOAD

Advice Letter 516-B

Updated on 11 August 2020

Statewide Stabilization General Rate Case
Effective: August 6, 2020
DOWNLOAD

Nor Cal Waterworks

Service Charges
The Service Charge is a Readiness to Serve Charge which is applicable to all metered water service and to which is added the charge for water used, computed at the Quantity Rate below.

New Service Advance Deposit $ N/A
Meter Size Monthly Charge
5/8 by 3/4 inch $  45.09
3/4 inch $  67.61
1 inch $  112.56
1 1/2 inch $ N/A
2 inch $ N/A
Flat Rate
For a single-family residential unit and/or an individual lot: $  70.92
For each existing single-family residential unit, including premises not exceeding 9,000 sq. ft. in area…
  a. For each additional single-family residential unit on the same premises and served from the same service connection. $  35.48
  b. For each 100 sq.ft. of premises in excess of 9,000 sq.ft. $  0.87
Quantity Rate
For all water used, per 100 cubic feet $ 2.570
Late Fee
For monthly bills not paid by the due date $ 18.00

 

California Public Utilities Commission (CPUC) Reimbursement Surcharge
A 0.7% surcharge is required to be added to all customers’ bills, which is calculated on all amounts due and is forwarded to the Commission throughout the year.

Other Services and Fees
Please see the back of your bill for additional information about other services and fees. Please see the Special Conditions page for information regarding current CPUC-authorized surcharges on your bill.

Advice Letters

Advice Letter 000

Updated on

GRC
Effective: Coming Soon
DOWNLOAD

Advice Letter 000

Updated on

GRC
Effective: Coming Soon
DOWNLOAD

Advice Letter 000

Updated on

GRC
Effective: Coming Soon
DOWNLOAD